With the ongoing Canada Post Strike, the Town of Thorsby has been assured that all residents with a local PO Box will receive their Utility Bills. If…
The Bulk Water Station is Fixed!
Update as of July 18th, 10:30am:
We have fixed the bulk water fill station, and it is operational.
NOTE: Tank trucks and other trucks are required to exercise extreme caution when moving under the hose assembly. It is for a fragile assembly, not a permanent fill assembly and driving under the hose without being very cautious rips the valve assembly from inside and floods the public works shop. This is the second fix this year for this same event.
The new bulk water station is currently being built so in the mean time please be cautious and responsible.
Thank you for your patience and understanding!